CAT 2022 Slot 1DILR Question 5

Routes & NetworkEasy
Passage / Data

Directions for next 5 questions

​​​​​​​

Given above is the schematic map of the metro lines in a city with rectangles denoting terminal stations (e.g. A), diamonds denoting junction stations (e.g. R) and small filled-up circles denoting other stations. Each train runs either in east-west or north-south direction, but not both. All trains stop for 2 minutes at each of the junction stations on the way and for 1 minute at each of the other stations. It takes 2 minutes to reach the next station for trains going in east-west direction and 3 minutes to reach the next station for trains going in north-south direction. From each terminal station, the first train starts at 6 am; the last trains leave the terminal stations at midnight. Otherwise, during the service hours, there are metro service every 15 minutes in the north-south lines and every 10 minutes in the east west lines. A train must rest for at least 15 minutes after completing a trip at the terminal station, before it can undertake the next trip in the reverse direction. (All questions are related to this metro service only. Assume that if someone reaches a station exactly at the time a train is supposed to leave, (s)he can catch that train.)

What is the minimum number of trains that are required to provide the service in this city?

Answer & solution

Answer: 48

Solution

Consider the solution to previous question.

We need at least 8 trains on AB route as well as 8 trains on CD route.
∴ 16 trains on north-south routes.

Total time taken by a east-west train = 61 mins (calculated in first question of this set)

A train going from M to N at 6 am will reach N at 7:01 and will be ready for journey back at 7:16 am. A train starts from N every 10 mins. Hence, this train can start its journey at 7:20 am.

∴ There have to be trains starting at 6 am, 6:10 am, 6:20 am, 6:30 am, 6:40 am, 6:50 am, 7 am and 7:10 am before trains coming from M can start their journey back.

Hence, we need at least 8 trains from N to M and similarly from M to N.

∴ We need at least 16 trains on the route MN and 16 trains on PQ route
∴ 32 trains on east-west routes.

⇒ we need at least 16 + 32 = 48 trains.

Hence, 48.

CAT 2022 Slot 1 DILR Q5: What is the minimum number of trains that are required to provide the service in this city? — Solution | TheCATExam