CAT 1995 — DILR Question 33
Direction: Answer the questions based on the following table.
Machine M1 as well as machine M2 can independently produce either product P or product Q. The time taken by machines M1 and M2 (in minutes) to produce one unit of product P and product Q are given in the table below: (Each machine works 8 hour per day).
âââââââ
âââââââ
What is the least number of machine hours required to produce 30 pieces of P and 25 pieces of Q respectively?
Answer & solution
Correct answer: 6 hr 30 min
6 hr 30 min
- B
7 hr 24 min
- C
6 hr 48 min
- D
4 hr 6 min
In order to minimize time required, we will manufacture P on M2 and Q on M1. Number of machine hours required to manufacture 30 units of P on M2 = (30 × 8) = 240 min = 4 hr. Number of machine hours required to manufacture 25 units of Q on M1 = (25 × 6) = 150 min = 2.5 hr. So total time taken = (4 + 2.5) = 6.5 hr or 6 hr 30 min.
Related Tables questions
- In which year was the tax per rupee of ‘profit before tax’ lowest?…
- In which year was the sales per rupee of share capital highest?…
- In which year was the profit before tax per rupee of sales highest?…
- In which year was the percentage addition to reserves over previous years reserv…
- Amount of the reserves at the end of 1994 is…
- The maximum percentage decrease in market share is…